Description
ALONG can provide a entire solution from waste to energy, scope of equipment supply covers waste pre-treatment, anaerobic fermentation, biogas cleaning, Combined Heat&Power Unit(CHP), Bio-natural Gas making system, biogas flare/boiler and all auxiliary materials, in conjunction with services of process design, equipment selection, installation and operation & maintenance support.
Free design offer: after Clients purchased the equipments mentioned in the biogas plant design, the 100% amount of design fee will be as part of the equipments cost.
1 Complete the general plan of the project.
2 The civil construction drawing.
3 Professional construction drawing of the water supply and drainage, the process professional PID picture, and the equipment layout.
4 The construction drawings of the professional, electrical and instrument professional.
The above expert construction blueprints drawings are all 8 copies.
The whole biogas project and sewage treatment process design principles:
1. Advanced technology, reliability, and adaptability.
1.1 According to the actual situation of the plant, choose the most advanced technology program.
1.2 According to the actual situation of the local, choose a successful case of the project to ensure that the project can be long-term stable operation.
1.3 According to the owners of economic conditions and operational skills level, select the most appropriate program, easy to actual operation and maintenance.
2. The principle of maximizing economic efficiency
2.1 to ensure the advanced nature of technology on the basis of optimizing the process and the various unit design, reduce one-time investment to ensure the best cost-effective and the shortest payback period.
2.2 follow the concept of circular economy, the entire field of energy flow analysis and design, to minimize energy consumption, to ensure that biogas projects for enterprises to bring the overall maximum benefits.
3. The principle of maximizing environmental and social benefits
3.1 to the product (biogas, biogas residue, biogas slurry) to make full use of, and focus on design and landscaping, so that the overall area of the station area and the harmonization of the community.
3.2 The design and implementation of the process to comply with national and local laws and regulations and industrial policies to ensure that the project in line with local environmental, economic and social development planning, after the completion of the project can improve public heating, catering and other energy, and play an exemplary role in driving the local economy And social development.